KPI Green Energy Limited has awarded a significant work order to Bondada Engineering Limited for the supply of materials for a solar power generation plant with a capacity of 130 MWp/100 MWac, along with the installation services for the same plant.
This order, valued at Rs. 467,99,99,965/- (Four Hundred Sixty-Seven Crore Ninety-Nine Lakh Ninety-Nine Thousand Nine Hundred and Sixty-Five Only), including GST, is a domestic contract and is to be executed within 12 months from the date of receipt of the purchase order.