STOCK NEWSNLC India Commissions 660 MW Unit-3 at Ghatampur Thermal Power Project, Installed Capacity Rises to 8,405 MW NLC India Commissions 660 MW Unit-3 at Ghatampur Thermal Power Project, Installed Capacity Rises to 8,405 MW Read Post »
STOCK NEWSPatel Engineering Emerges as L1 Bidder for ₹1,593.08 Crore Nepal Hydropower Project Patel Engineering Emerges as L1 Bidder for ₹1,593.08 Crore Nepal Hydropower Project Read Post »
ORDER WINSDEE Development Engineers Wins ₹58 Crore Seamless Pipe Order From Power Sector Joint Venture DEE Development Engineers Wins ₹58 Crore Seamless Pipe Order From Power Sector Joint Venture Read Post »
STOCK NEWSJSW Energy Signs Second 1,600 MW Thermal Power PPA With West Bengal Discom, Salboni Capacity Rises to 3,200 MW JSW Energy Signs Second 1,600 MW Thermal Power PPA With West Bengal Discom, Salboni Capacity Rises to 3,200 MW Read Post »